Predicting lighting energy use under daylight linked lighting controls

Littlefair, P J (1998) Predicting lighting energy use under daylight linked lighting controls. Building Research & Information, 26(4), pp. 208-222. ISSN 0961-3218

Abstract

For daylight to make a real contribution to energy efficiency, appropriate control of electric lighting is essential. This paper outlines methods to predict electric lighting use for various different types of control, given internal daylight illuminances. Two different kinds of calculation are considered. Annual lighting use can be determined from yearly daylight data, usually in the form of a cumulative distribution. More sophisticated computer programs use hourly daylight data to give a continuous profile of lighting use and the consequent energy flows and environmental conditions within a building. For both types of application, appropriate algorithms are given to quantify the savings from various types of photoelectric and manual controls.

Item Type: Article
Uncontrolled Keywords: controls; daylight; energy; lighting; manual switching; photoelectric
Index terms: savings, lighting control, energy efficiency, computer program, environmental conditions, energy use, illuminance
Subjects: economic analysis, energy efficiency, sustainability and energy, environmental science, building performance, energy systems, software systems
Topics: Business Strategy, Design Practice, Digital Applications, Sustainability
Descriptive scope: 1 C

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here