Prediction and optimization of life-cycle costs in early design

Bogenstätter, U (2000) Prediction and optimization of life-cycle costs in early design. Building Research & Information, 28(5-6), pp. 376-386. ISSN 0961-3218

Abstract

Operation costs over the life-cycle of a building are a multiple of the initial construction costs. Decisions in the programming stage (briefing) and design process influence life-cycle costs in terms of space, the quantity of structural elements, technical/mechanical service equipment and the choice of materials. The way that the economic and ecological goals are set will influence the efficiency and effectiveness through an appropriate design. To realize the requirements of sustainable building in daily administrative practice, characteristic values for specific building tasks are needed which are determined through the analysis of completed buildings. The resulting target values enable architects and engineers to get a clear and consistent definition of project goals at the programming stage. An interdisciplinary team is needed to manage and guarantee these target values during the whole design process and at the beginning of the utilization phase.

Item Type: Article
Uncontrolled Keywords: briefing; design characteristics; durability; Germany; interdisciplinary team; life-cycle costs; occupancy; operating costs; performance specification; sustainable building
Index terms: briefing, engineer, architect, operating cost, Germany, durability, efficiency, guarantee, construction cost, sustainable building, programming, performance specification, effectiveness, design process
Subjects: performance management, sustainable construction, profession, design methods, tendering, economic analysis, contract structure, programming, financial and cost management, Geography, material degradation and durability, scope management
Topics: Business Strategy, Design Practice, Geographical Context, Quality Management, Roles and Professions, Construction Materials, Project Management, Cost Management, Digital Applications, Sustainability, Procurement
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here