Measuring project complexity: A project manager's tool

Sinha, S; Kumar, B and Thomson, A (2006) Measuring project complexity: A project manager's tool. Architectural Engineering and Design Management, 2(3), pp. 187-202. ISSN 1745-2007

Abstract

This paper describes a framework that measures complexity within the various stages of a project, together with a measure of complexity for the complete project lifecycle in the form of a complexity index (CI). In essence, the framework provides the project manager with a tool that helps identify the possible manifestation of complexity within the project process and the ability to plan accordingly to minimize its impact. This framework was developed and evaluated based on engineering design projects. Initially, the paper provides an overview of the framework describing each of its component parts. An account of how the framework generates complexity measures is provided by means of an example. Case studies used for the evaluation of the framework are summarized.

Item Type: Article
Uncontrolled Keywords: complexity generating factors; complexity justifying factors; decision making; human resources; information processed
Index terms: case study, project manager, project lifecycle, human resource, engineering design, decision-making, project complexity, complexity
Subjects: project completion, data collection methods, profession, management, design process, organizational theory, decision analysis, systems engineering
Topics: Engineering Principles, Project Management, Research Practice, Roles and Professions, Risk Management, Human Resources, Digital Applications
Descriptive scope: 3 PCE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here