Is the current theory of construction a hindrance to innovation?

Koskela, L and Vrijhoef, R (2001) Is the current theory of construction a hindrance to innovation? Building Research & Information, 29(3), pp. 197-207. ISSN 0961-3218

Abstract

An explanation for the low innovation activity in construction is put forward. The central argument is that the current theory of construction is one root cause for low innovation activity. Instead, an explicit and more powerful theory of construction is needed for further innovation, which is 'to manage new ideas into good currency'. There are three main mechanisms in the current theory of construction which are identified as causing this hindrance. Firstly, production theories in general, as well as construction theories specifically, have been implicity. Therefore, it has not been possible to transfer radical managerial innovations, such as lean production, from manufacturing to construction at a theoretical level. Direct application of this production template to construction has been limited due to the different context of construction in comparison with manufacturing. Secondly, the current theoretical model of construction is based on the transformation model of production. It is argued that the principles of this model are counterproductive, because uncertainty and interdependence are abstracted away. This leads to fragmented and myopic management and inflated variability. Practical examples show that these deficiencies and related practical constraints hinder the implementation of top-down innovations. Thirdly, empirical research shows that also bottom-up innovations - systematic learning and problem solving - are being hindered by the current theory. Thus, the advancement of innovations in construction requires that a new, explicit and valid theory of construction is created, and business models and control methods are developed on the basis of that new theory.

Item Type: Article
Uncontrolled Keywords: diffusion of manufacturing templates; innovation; innovation theory; management; production theory
Index terms: business model, problem solving, variability, interdependence, implementation, control method, transformation, innovation theory, lean production
Subjects: contractual arrangements, business, statistical analysis, organizational analysis, monitoring and control, decision-making and reasoning, manufacturing engineering, theoretical framing
Topics: Organizational Design, Procurement, Engineering Principles, Research Practice, Business Strategy
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here