Value stream analysis of a re-engineered construction supply chain

Arbulu, R J; Tommelein, I D; Walsh, K D and Hershauer, J C (2003) Value stream analysis of a re-engineered construction supply chain. Building Research & Information, 31(2), pp. 161-171. ISSN 0961-3218

Abstract

A case study is presented that documents the most common configuration of the supply chain for pipe supports used in power plants in the USA. This supply chain, like many others in construction, has numerous inefficiencies, many of which occur at the interfaces between processes, disciplines or organizations. Recognizing and understanding such inefficiencies, their causes and potential remedies provides a basis for process re-engineering. The study describes how today's industry practices are changing to yield shorter supply chain lead times. To model the mechanisms that drive those changes, data are presented from industry practice in the form of value stream maps that span organizational disciplines and company boundaries. Metrics commonly used in lean construction are introduced to gauge system performance. A current state map documents how work flows throughout the design, procurement and fabrication phases of pipe supports. Analysis of this current state map highlights value-added and non-value-added times and lead times. A future state map then illustrates process improvements that can be obtained by applying various supply chain management tactics. The methodology applied in this case study could be applied to other construction supply chains equally well.

Item Type: Article
Uncontrolled Keywords: construction performance; lean project delivery system; production management; re-engineering construction; supply chain management; value stream mapping; waste
Index terms: construction performance, power plant, value stream mapping, value stream map, process improvement, lean construction, production management, case study, lean project delivery, fabrication, boundaries, value stream, methodology, construction supply chain, configuration, lead time, documents
Subjects: property law, performance assessment, project delivery, data collection methods, business, construction logistics, project controls, building construction, infrastructure and transport systems, systems engineering, manufacturing engineering, management, lean construction, research methods, professional development
Topics: Legal Issues, Value Management, Supply Chain Management, Site Management, Time Control, Business Strategy, Project Management, Research Practice, Information Management, Engineering Principles
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here