Design quality indicators: Work in progress

Whyte, J K and Gann, D M (2003) Design quality indicators: Work in progress. Building Research & Information, 31(5), pp. 387-398. ISSN 0961-3218

Abstract

The Design Quality Indicator (DQI) is an assessment tool for evaluating the design quality of buildings. It is being piloted across the UK construction sector through the DQI Trailblazing Scheme. By February 2003, actual uses represented about £900 million of construction output on projects ranging from £900 000 to £450 million. The aim is for 20% of all UK construction projects (having a value in excess of £1 million) to use the DQI by the end of 2007. This work-in-progress paper describes recent and ongoing development work, providing an update on the research described in Gann et al. (2003). The focus is on beta-testing the DQI through the Trailblazing Scheme and the development of the interactive web-based interface. Feedback from users involved in the Trailblazing Scheme is reported along with key issues raised at the review conference. Reflections on the uses of the tool and suggestions for further research are provided.

Item Type: Article
Uncontrolled Keywords: design; design quality; design research; indicators; performance measurement; UK
Index terms: design quality, performance measurement, design quality indicator, conference, construction project, reflection, construction output, testing, construction sector
Subjects: industry analysis, professional development, production management, performance measurement, professional practice, operations management, research dissemination and communication
Topics: Design Practice, Quality Management, Information Management, Engineering Principles, Research Practice, Project Management
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here