Chang, Y; Wilkinson, S; Seville, E and Potangaroa, R (2012) Changes in resource need for post-disaster reconstruction: A longitudinal study in China. Building Research & Information, 40(3), pp. 327-336. ISSN 0961-3218
Abstract
Following a major disaster, shortages of resources and the increased costs of building materials are likely to slow post-disaster reconstruction. To examine the resource needs for post-disaster housing reconstruction, a longitudinal study was conducted between 2008 and 2010 of the Wenchuan earthquake-impacted Mianzhu City in China. Cost escalation of the common materials of brick, cement, aggregate and steel shows the varying correlation between material requirements and the reconstruction progress. Based on in-field surveys and interviews, the underlying drivers that contributed to changes in the cost of these materials were identified. Findings suggest that apart from physical disaster impacts and urgency of housing reconstruction, other effects, such as legislative interventions and the economic environment, are primary factors in explaining changes in resource requirements. Cost changes for brick and aggregate were to a great extent influenced by local policies and mandates. In contrast, cost changes for non-localized materials such as cement and steel were largely dominated by broader economic effects and domestic strategies in China. To reduce potential resource cost fluctuations and their impacts on recovery, robust post-disaster reconstruction planning is needed and requires systematic mapping and monitoring of resource demands over the reconstruction period.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | China; construction materials; cost escalation; post-disaster reconstruction; recovery strategy; resource shortage |
| Index terms: | shortages, strategy, post-disaster housing reconstruction, interview, building material, post-disaster reconstruction, mandate, recovery, reconstruction, Wenchuan earthquake, housing reconstruction, aggregate, China, construction material, monitoring, cost escalation, survey, mapping |
| Subjects: | operations management, data collection methods, materials science, environmental hazards, building construction, economic analysis, Geography, political science, management, spatial and geospatial analysis, post-disaster and reconstruction, control systems, building materials, economic development, economics |
| Topics: | Engineering Principles, Sustainability, Design Practice, Project Management, Cost Management, Site Management, Urban Studies, Geographical Context, Research Practice, Business Strategy, Governance |
| Descriptive scope: | 3 PCE |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here