Construction project teams and their development: Case studies in Sri Lanka

Senaratne, S and Hapuarachchi, A (2009) Construction project teams and their development: Case studies in Sri Lanka. Architectural Engineering and Design Management, 5(4), pp. 215-224. ISSN 1745-2007

Abstract

The construction industry can benefit from teamworking because construction products are delivered by a collection of diverse professionals. The importance of teams and their development in construction is an issue of international relevance - several influential government reports in the UK have highlighted this. However, effective teams cannot be created at a stroke - they need time and the opportunity to mature. This is usually referred to as team development and this area has been the subject of several research studies. However, there is a lack of research into the nature of construction teams and their development. This study explores how construction project teams go through a team development process. It was approached through case studies of three representative construction projects in Sri Lanka. Semi-structured interviews were conducted with five distinct participants of each selected construction team during data collection. Based on the findings, a model of team development with regard to construction teams in Sri Lanka was developed. The new model indicates that construction teams develop in a linear sequence, as suggested in the literature. However, the study unearthed that within this basic linear sequence, several cycles can be created. It is hoped that these findings will be useful to general construction teams that operate under separated contract arrangements in other countries.

Item Type: Article
Uncontrolled Keywords: construction industry; construction teams; Sri Lanka; team development
Index terms: contract arrangement, construction team, case study, construction project team, team development process, interview, construction product, team development, construction industry, Sri Lanka, construction project
Subjects: project delivery, economic analysis, contractual arrangements, data collection methods, industry analysis, management, production management, Geography
Topics: Research Practice, Geographical Context, Project Management, Business Strategy, Procurement, Organizational Design
Descriptive scope: 3 PTE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here