Using decomposition analysis to forecast metal usage in the building stock

Hatayama, H and Tahara, K (2016) Using decomposition analysis to forecast metal usage in the building stock. Building Research & Information, 44(1), pp. 63-72. ISSN 0961-3218

Abstract

As large amounts of materials are used and have accumulated in buildings and civil engineering projects, it is necessary to understand material flow in terms of construction sectors for resource management. The consumption, discard and in-use stock of four metals (steel, aluminium, copper and zinc) in Japan's building stock are forecast through to 2050. To clarify the factors that affect metal stocks and flows in construction, the metal consumption was decomposed into annual new floor area constructed and metal intensity (i.e. the amount of metal used per unit floor area). The decomposition was meaningful for understanding characteristic patterns of factors of different metals and for envisaging future scenarios based on past trends. It was estimated that the annual new floor area constructed will remain at current levels, whereas metal intensity will have a significant impact on stocks and flows. The methodology developed in this study can be used to evaluate the impact of technology changes that would take place in building and civil engineering projects.;  As large amounts of materials are used and have accumulated in buildings and civil engineering projects, it is necessary to understand material flow in terms of construction sectors for resource management. The consumption, discard and in-use stock of four metals (steel, aluminium, copper and zinc) in Japan's building stock are forecast through to 2050. To clarify the factors that affect metal stocks and flows in construction, the metal consumption was decomposed into annual new floor area constructed and metal intensity (i.e. the amount of metal used per unit floor area). The decomposition was meaningful for understanding characteristic patterns of factors of different metals and for envisaging future scenarios based on past trends. It was estimated that the annual new floor area constructed will remain at current levels, whereas metal intensity will have a significant impact on stocks and flows. The methodology developed in this study can be used to evaluate the impact of technology changes that would take place in building and civil engineering projects.;

Item Type: Article
Uncontrolled Keywords: material flow analysis; building stock; forecasting; japan; decomposition analysis; resource flows; trend analysis; building construction; building materials; forecasting techniques; metals; civil engineering; technological change
Index terms: forecasting, resource flow, Japan, building construction, building stock, material flow analysis, technological change, building material, copper, methodology, metal, decomposition analysis, resource management, consumption, construction sector
Subjects: building construction, asset management, industry analysis, research methods, traditional and composite building materials, Geography, material science and engineering, building materials, data analysis and analytics, resource management, prediction and forecasting, consumer economics, innovation studies, control systems
Topics: Design Practice, Site Management, Construction Materials, Geographical Context, Project Management, Research Practice, Business Strategy, Sustainability, Construction Technology, Stakeholder Management
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here