Reconsidering adaptive industrialized construction in Chinese rural areas: Responding to the challenge of COVID-19

Xiang, Y; Bu, J; Zhu, K; Ma, K; Opoku, A; Florez-Perez, L; Zhang, H and Wu, Y (2023) Reconsidering adaptive industrialized construction in Chinese rural areas: Responding to the challenge of COVID-19. Building Research & Information, 51(3), pp. 316-332. ISSN 0961-3218

Abstract

The spread of COVID-19 has caused an increasing demand for public medical rooms, especially in Chinese rural regions. Industrialized building techniques have been shown as capable of fulfilling this demand through the case of the Leishenshan Hospital. However, industrialized construction requires developed technologies and infrastructures, which are often non-existent in rural areas, thus making it difficult to replicate such a feat. Therefore, more suitable solutions for Chinese rural project delivery in the pandemic scenario are needed. Considering the constraints of pandemic prevention and rural applicability, the adaptive industrialized construction (AIC) method has potential as an alternative. This study evaluates the application of AIC by comparing simulated results using AIC and a conventional method, based on five evaluation indicators: construction speed, labourer distribution, material consumption, equipment utilization, and cost. Taking an actual project as the sample building, the results indicate that the AIC method has several advantages. These include a shorter construction period, less labourer gathering onsite, and a lower cost, suggesting it may be an effective solution for rural project delivery during the pandemic. Architects and contractors could employ the same evaluation method to explore more solutions and optimize the construction schedule for future rapid construction needs in rural areas in a pandemic.

Item Type: Article
Uncontrolled Keywords: adaptive industrialized construction; construction simulation; COVID-19; rural construction
Index terms: rural area, consumption, COVID-19, pandemic, architect, construction simulation, prevention, project delivery, onsite, industrialized building, industrialized construction
Subjects: project delivery, building construction, profession, financial risk, construction type, health risk and incident analysis, modelling and simulation, consumer economics, land use and regional development
Topics: Procurement, Construction Technology, Cost Management, Health and Safety, Roles and Professions, Urban Studies, Digital Applications, Stakeholder Management
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here