Construction scheduling using 3-D CAD and walk-thru

Songer, A D; Diekmann, J E; Rasheed, K A and Hays, B (2001) Construction scheduling using 3-D CAD and walk-thru. Construction Innovation, 1(3), pp. 191-207. ISSN 1471-4175

Abstract

Three-dimensional (3-D) CAD and walk-thru are promising technologies in design and construction. While gaining widespread acceptance in design, the use of 3-D and walk-thru during the construction phases of projects is evolving slowly. One significant barrier to acceptance includes lack of documented cost/benefit analysis. Experimental results reported herein provide quantitative evidence of the advantages of 3-D CAD and walk-thru for planning construction projects. The results provide strong evidence of the practical benefits and appropriate areas of application for 3-D CAD and walk-thru technology.

Item Type: Article
Uncontrolled Keywords: 3-d CAD; planning; project management; scheduling; walk-thru
Index terms: construction project, evidence, scheduling, construction phase, project management, design and construction, construction scheduling
Subjects: contractual arrangements, project delivery, operations research, evaluation and assessment methods, project controls, production management, project management theory and practice
Topics: Time Control, Procurement, Project Management, Research Practice
Descriptive scope: 3 PCA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here