Mawdesley, M J; A-Jibouri, S H; Askew, W H and Patterson, D E (2002) A model for the automated generation of earthwork planning activities. Construction Innovation, 2(4), pp. 249-268. ISSN 1471-4175
Abstract
A review of techniques used in industry showed that there is an absence of a formalised, systematic approach to earthworks planning. The techniques used tend to be subjective and time consuming with a heavy reliance given to the experience and knowledge of the planner. This absence of a formalised technique can lead to inaccurate planning and makes explanation of the techniques difficult. This paper describes the development of a new automated approach for use by the planners to generate earthworks activities that overcomes such limitations. As well as creating activity sets in a much shorter time, the ability to compare various sets allows the planner more scope when planning earthworks. The model is able to generate activity sets that are comparable to those generated by a project planner.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | activity generation; construction; earthwork; linear projects; planning |
| Index terms: | planner, earthwork |
| Subjects: | construction methods, profession |
| Topics: | Engineering Principles, Roles and Professions |
| Descriptive scope: | 1 P |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here