Project scheduling and monitoring: Current research status

Ahuja, V and Thiruvengadam, V (2004) Project scheduling and monitoring: Current research status. Construction Innovation, 4(1), pp. 19-31. ISSN 1471-4175

Abstract

Project scheduling/rescheduling occurs in all stages of projects, from feasibility stage to monitoring stage to completion. Since the late 1950s, network-based techniques CPM (critical path method) and PERT (programme evaluation review technique) are the techniques commonly used for project management. However, there are limitations in working with these tools that need to be overcome. Also, the computing ef. ciency of classic CPM/PERT analysis needs to be enhanced. Substantial research has been carried out globally in this field covering all areas of project scheduling: time scheduling, resource scheduling, cost scheduling, modern project management techniques, advanced mathematical models used for construction scheduling, and so on. To understand and document this research status, the authors have carried out an extensive study of various journals, published and unpublished research papers, and present this literature review.

Item Type: Article
Uncontrolled Keywords: project monitoring; project scheduling; research status; resource scheduling; simulation techniques; time-cost optimization
Index terms: monitoring, project management, construction scheduling, resource scheduling, project management technique, computing, project monitoring, critical path method, scheduling, project scheduling, mathematical model, cost optimization, research paper, journal, programme, literature review
Subjects: research dissemination and communication, mathematical modelling, control systems, computing systems, operations management, operations research, data analysis and analytics, economics, project management theory and practice, project controls
Topics: Site Management, Time Control, Digital Applications, Cost Management, Information Management, Project Management, Research Practice
Descriptive scope: 3 PCA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here