Corrigendum to building construction: A deterministic non-periodic flow: a case study of chaos theories in tracking production flow (architectural engineering and design management, (2013), 9, 1 (21-48))

Fernández-Solís, J L; Lü, X and Ryoo, B Y (2013) Corrigendum to building construction: A deterministic non-periodic flow: a case study of chaos theories in tracking production flow (architectural engineering and design management, (2013), 9, 1 (21-48)). Architectural Engineering and Design Management, 9(2), ISSN 1745-2007

Item Type: Article
Index terms: chaos theory, architectural engineering, design management, building construction, case study
Subjects: mathematical modelling, data collection methods, design practice, design process, building construction
Topics: Design Practice, Research Practice, Construction Technology
Descriptive scope: 3 PTE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here