Hybrid AI system for retaining wall selection

Yang, J B (2004) Hybrid AI system for retaining wall selection. Construction Innovation, 4(1), pp. 33-52. ISSN 1471-4175

Abstract

This paper presents a hybrid artificial intelligence (AI) system capable of integrating techniques of case-based reasoning, rule induction and expert system, using them for knowledge acquisition and problem solving of selecting appropriate retaining wall systems at the project planning stage. The proposed hybrid system can eliminate the bottleneck of knowledge acquisition in developing a knowledge-based system and improve the solution quality of the AI-based system. Test results indicate that solutions generated by the proposed hybrid system are better than those generated by using a single technique.

Item Type: Article
Uncontrolled Keywords: case-based reasoning; expert systems; hybrid system; retaining wall selection; rule induction
Index terms: case-based reasoning, hybrid system, expert system, problem solving, retaining wall, project planning, knowledge-based system, knowledge acquisition, artificial intelligence
Subjects: control systems, artificial intelligence, structural engineering, decision-making and reasoning, data management, cognitive psychology, systems and processes, student development
Topics: Engineering Principles, Project Management, Research Practice, Digital Applications, Education
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here