Assessing project suitability for off-site production

Blismas, N; Gibb, A and Pasquire, C (2005) Assessing project suitability for off-site production. Construction Economics and Building, 5(1), pp. 9-15. ISSN 2204-9029

Abstract

Implementation of off-site production on construction projects isoften hindered by a number of specific process and procurementconstraints. These constraints are largely influenced by decisionswithin the control of construction clients, suggesting that theyhave a significant influence over the adoption of off-site productioninto construction projects. However, an appreciation of the effectof these constraints has been lacking. Addressing this need, anoff-site production implementation assessment instrument thatresides within a larger toolkit (IMMPREST) was developed usingquestionnaire survey data and a series of industrial workshops.IMMPREST is an interactive electronic toolkit developed byLoughborough University (UK), in conjunction with eleven industrialpartners, which facilitates the evaluation of benefit arising fromuse of off-site production within construction. It identifies thefactors that need to be considered for an evaluation, the datarequired to assess the effect of these factors, and where therequired data resides within the supply chain. Development ofthe implementation assessment instrument is discussed, whilstalso making reference to the role that clients can play in creatingthe process and procurement conditions that promote rather thanconstrain the adoption of off-site production.

Item Type: Article
Uncontrolled Keywords: constraints; drivers; off-site production; pre-fabrication; toolkit
Index terms: construction project, off-site production, workshop, suitability, implementation, toolkit, fabrication, construction client, survey
Subjects: contractual arrangements, design criteria, production management, practitioner, construction type, manufacturing engineering, data collection methods, software systems
Topics: Design Practice, Research Practice, Project Management, Engineering Principles, Construction Technology, Procurement, Roles and Professions
Descriptive scope: 3 PCE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here