Chan, A P C; Chiang, Y H; Mak, S W K; Choy, L H T and James, M W W (2006) Forecasting the demand for construction skills in Hong Kong. Construction Innovation, 6(1), pp. 3-19. ISSN 1471-4175
Abstract
Efficient manpower planning has been recognized as a critical aspect for the development of an economy. In 2001, the Works Bureau of the Hong Kong SAR Government (predecessor of Environment, Transport and Works Bureau) commissioned an HKPolyU consultancy team to develop a computerbased model to estimate the demand for different categories of construction personnel. This article presents the concept and features of the manpower demandforecasting model developed for the construction industry of Hong Kong. The forecasting model is formulated on the basis of the labour multiplier approach by deriving the relationship between the number of workers required and the project expenditure in the given project duration. Multipliers for 61 project types were derived for 38 labour trades using completed project data. The labour demand by occupation for each project can then be estimated by multiplying the corresponding multipliers and the estimated project expenditure. Several unique features of the model have been developed, including “normalization” and “contract cost adjustment factor”. Normalizing the labour multipliers can facilitate the prediction of occupational labour requirements at different stages of a construction project. The adjustment factor is introduced to eliminate the discrepancy between the original estimates and final contract values so as to enhance the estimation accuracy. The model can also be used to predict the number of jobs created for a given level of investment. The government can apply this model to check and compare which project types will generate most jobs before committing public money. This model could be easily adopted and adapted by foreign construction authorities while planning manpower.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | forecasting model; Hong Kong; manpower demand; manpower forecasting; the construction industry |
| Index terms: | accuracy, occupation, project data, construction personnel, construction project, consultancy, forecasting, Hong Kong, estimation, workforce planning, estimate, duration, construction industry, labour requirement |
| Subjects: | management, Geography, production management, professional development, project controls, sociology, industry analysis, workforce, data collection methods, organization, operations management, prediction and forecasting, financial and cost management |
| Topics: | Human Resources, Time Control, Site Management, Organizational Design, Information Management, Research Practice, Project Management, Geographical Context, Cost Management, Roles and Professions |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here