Estimating productivity using simulation: A case study of Gaza beach embankment protection project

Rustom, R N and Yahia, A (2007) Estimating productivity using simulation: A case study of Gaza beach embankment protection project. Construction Innovation, 7(2), pp. 167-186. ISSN 1471-4175

Abstract

Purpose – Recently, there has been increased interest in the use of simulation for real-time planning, scheduling, control of construction projects and obtaining optimum productivity. The purpose of this case study is to demonstrate the use of simulation as an effective tool for estimating production rates in an attempt to prepare optimal time schedules. Design/methodology/approach – Gaza Beach-Camp Shore Protection Project was taken as a case study. The case study is used to demonstrate how to estimate effectively the production rates of labour and equipment during the implementation of the project activities and to estimate the duration of the project using process simulation. The model simulates the construction of 1,600 m of gabions divided into 32 identical stations. Probabilistic distribution functions were used to fit the time functions for each process and sub-process based on 100 replications. Findings – The simulation output generated three probabilistic values for completing each activity upon which the overall project completion time is determined. The resources utilizations for all processes were also generated and used in the determination of the average production rates. Originality/value – The computation of productivity based on effective resources utilization has been demonstrated to give better results than estimating productivity based on aggregate resources assignments.

Item Type: Article
Uncontrolled Keywords: construction operations; palestine; optimization techniques; production scheduling; productivity rate; simulation
Index terms: implementation, estimate, duration, productivity, aggregate, construction operation, optimization technique, Palestine, case study, estimating, embankment, methodology, construction project, distribution function, completion time, computation, process simulation, scheduling
Subjects: construction operations, contractual arrangements, financial and cost management, operations research, materials science, data collection methods, computational methods, infrastructure and transport systems, project controls, Geography, production management, probability and distributions, management, algorithms, research methods
Topics: Time Control, Site Management, Digital Applications, Procurement, Cost Management, Business Strategy, Research Practice, Geographical Context, Project Management, Engineering Principles
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here