Hassan, M M and Gruber, S (2008) Application of discrete-event simulation to study the paving operation of asphalt concrete. Construction Innovation, 8(1), pp. 7-22. ISSN 1471-4175
Abstract
To evaluate and optimize asphalt paving operations taking place in the reconstruction project of Interstate 74 in the USA using simulation. Data collected during construction was used to determine useful probabilistic density functions for the activities duration and to validate a developed simulation model. Upon validation, the developed model was used to study the impact of resources on the flow of operations, and on the cost-effectiveness of the construction process. The developed simulation model was successful in simulating the paving operation and its accuracy was acceptable compared to field measurements. Based on the results of a sensitivity analysis of the critical resources, multiple factors were identified in the decision-making process to ensure that all aspects of the operation were considered. For the conditions pertinent to this construction site, 30 trucks, one paver, and two rollers are recommended. Using this set of resources results in a prompt and effective execution of the construction process. The developed model is applicable only to asphalt paving operations. The predictive capability of the developed model has not yet been investigated. Implementation of the presented model in practical applications can be accomplished by conducting short training courses. This will provide personnel with flexibility in addressing project-specifics conditions and limitations. If this approach is not feasible, production charts may be developed to easily determine the optimum resources that should be used given specific time constraints and quantity, issues. The presented methodology has great potential to optimize resources and production rates in similar asphalt paving operations. Moreover, benefits of simulation would be maximized if it was used during the planning phase, as it will affect equipment orders and material shipments.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | construction operations; main roads; simulation; United States of America |
| Index terms: | sensitivity analysis, paving, cost-effectivenes, personnel, accuracy, construction site, validation, methodology, construction process, United States of America, density, reconstruction, construction operation, field-measurement, decision-making process, duration, implementation |
| Subjects: | project controls, building construction, decision analysis, transportation engineering, environmental hazards, management, research methods, economics, Geography, professional development, work location, construction operations, contractual arrangements, analytical methods, data collection methods |
| Topics: | Site Management, Time Control, Urban Studies, Human Resources, Risk Management, Sustainability, Procurement, Cost Management, Engineering Principles, Information Management, Geographical Context, Research Practice |
| Descriptive scope: | 4 PCTE |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here