An empirical test of causal relationships of factors affecting ICT adoption for building project management: An Indian SME case study

Ahuja, V; Yang, J; Skitmore, M and Shankar, R (2010) An empirical test of causal relationships of factors affecting ICT adoption for building project management: An Indian SME case study. Construction Innovation, 10(2), pp. 164-180. ISSN 1471-4175

Abstract

Purpose – Building project management (BPM) requires effective coordination and collaboration between multiple project team organisations which can be achieved by real time information flow between all participants. In the present scenario, this can be achieved by the use of information communication technologies (ICT). The purpose of this paper is to present part of a research project conducted to study the causal relationships between factors affecting ICT adoption for BPM by small and medium enterprises. Design/methodology/approach – This paper discusses structural equation modelling (SEM) analysis conducted to test the causal relationships between quantitative factors. Data for quantitative analysis were gathered through a questionnaire survey conducted in the Indian construction industry. Findings – SEM analysis results help in demonstrating that an increased and matured use of ICT for general administration within the organisation would lead to: an improved ICT infrastructure within the organisation; development of electronic databases; and a staff that is confident of using information technology (IT) tools. In such a scenario, staff would use advanced software and IT technologies for project management (PM) processes and that would lead to an increased adoption of ICT for PM processes. But, for general administration also, ICT adoption would be enhanced if the organisation is interacting more with geographically separated agencies and senior management perceives that significant benefits would accrue by adoption of ICT. All the factors are interrelated and their effect cannot be maximized in isolation. Originality/value – The results provide direction to building project managers for strategically adopting the effective use of ICT within their organisations and for BPM in general.

Item Type: Article
Uncontrolled Keywords: communication technologies; India; project management; small to medium-sized enterprises
Index terms: coordination, project management, project team, real-time information, India, construction industry, database, case study, project manager, information technology, quantitative analysis, agency, questionnaire, collaboration, methodology, survey, structural equation modelling
Subjects: industry analysis, statistical analysis, data management, sociology, Geography, project management theory and practice, management, research methods, data analysis and analytics, project delivery, computing systems, profession, data collection methods
Topics: Organizational Design, Digital Applications, Roles and Professions, Research Practice, Project Management, Geographical Context
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here