Moselhi, O and Khan, Z (2010) Analysis of labour productivity of formwork operations in building construction. Construction Innovation, 10(3), pp. 286-303. ISSN 1471-4175
Abstract
Purpose – Labour productivity plays an important role in the successful delivery of engineering, procurement and construction projects. This paper aims to present a field study that determines the effects of a set of variables on daily and/or shortterm jobsite labour productivity, using artificial neural network model. Design/methodology/approach – The data used in this paper were collected over a period of ten months, directly from the job sites of two building construction projects in Montreal. A neural network model was used to study a number of factors considered to impact labour productivity on daily basis. These included temperature, relativehumidity, wind speed, precipitation, gang size, crew composition, height of work, type of work and construction method employed. The data were then analyzed to determine the influence of these parameters on site labour productivity. Findings – Among the nine parameters studied, temperature was found to have the most significant impact on productivity, closely followed by the height then by the type of work. Given the range of the collected data available on the variables considered, temperature, humidity and crew composition were found each to have a similar trend, with an optimum value that corresponds to the normalized maximum productivity. Originality/value – The findings of this paper will provide awareness and better understanding of parameters that impact labour productivity in building construction.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | Canada; construction industry; labour; learning curves; neural nets; productivity rate |
| Index terms: | precipitation, methodology, construction project, construction method, artificial neural network, building construction, neural network, wind speed, field study, construction industry, humidity, labour productivity, Canada, productivity, formwork, neural net |
| Subjects: | environmental science, artificial intelligence, modelling and simulation, climate science, industry analysis, building construction, Geography, production management, management, research methods |
| Topics: | Digital Applications, Site Management, Geographical Context, Project Management, Research Practice, Engineering Principles, Business Strategy, Construction Technology, Sustainability |
| Descriptive scope: | 4 PCTA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here