Lam, P T I and Wong, F W H (2011) A comparative study of buildability perspectives between clients, consultants and contractors. Construction Innovation, 11(3), pp. 305-320. ISSN 1471-4175
Abstract
Purpose - This paper aims to highlight the similarities and differences in the buildability perspectives held by the client and the design team (collectively known as the design decision-making group) and the contractor (known as the execution group). Design/methodology/approach - Buildability attributes were identified through a questionnaire survey, followed by factor analysis to consolidate them into nine buildability factors. These were then presented to 31 construction experts (comprising clients, consultants and contractors), who ranked the buildability factors in association with common construction systems using the analytical hierarchy process. Findings - Whilst the consensus was on "enabling design requirements to be easily visualised and co-ordinated by site staff" to make designs buildable, clients and design teams differed from contractors in perspectives such as overcoming site restrictions, achieving standardisation and flexibility. When applied to construction systems, clients and design teams ranked precast systems higher than contractors, who favoured in situ systems. Research limitations/ implications - Since the research was conducted in Hong Kong, the interpretation of the findings should be based on this contextual background as described in the paper. Originality/value - This paper highlights the common and different perspectives of the design decision-making group and the execution group in evaluating buildability and the reasons underlying their decisions. It paves the way for meaningful benchmarking of an important attribute affecting all construction stakeholders. The results form part of the development of a Buildability Assessment Model for use in Hong Kong, which is a useful tool for benchmarking buildability of designs, as in other countries (e.g. Singapore) which see the benefits of this important attribute on project performance.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | buildability assessment model; construction systems; design; stakeholders |
| Index terms: | site staff, analytical hierarchy process, project performance, factor analysis, standardization, comparative study, in-situ, Singapore, Hong Kong, design decision, benchmarking, construction system, questionnaire, methodology, survey, design team, buildability |
| Subjects: | professional practice, research design and methodology, data collection methods, practitioner, building construction, statistical analysis, design efficiency, decision-making and optimization, research methods, design practice, performance measurement, project management theory and practice, Geography |
| Topics: | Research Practice, Project Management, Geographical Context, Engineering Principles, Roles and Professions, Quality Management, Design Practice |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here