Tao, L and Kumaraswamy, M (2012) Unveiling relationships between contractor inputs and performance outputs. Construction Innovation, 12(1), pp. 86-98. ISSN 1471-4175
Abstract
Purpose - The purpose of this paper is to unveil any underlying relationships between contractor inputs and performance outputs. The outcome of the reported study is intended to help identify the inputs, which have more significant impacts on contractor performance outputs and therefore, help formulate more reliable "upfront" (ITex ante/IT) performance assessment criteria, hence improving approaches to the contractor-selection process. Design/methodology/approach - A case study was conducted on the Performance Assessment Scoring System (PASS) of a large public client in Hong Kong to determine the Pearson product-moment correlation between the scores of various input assessments and output assessments. Findings - The findings revealed relationships between some of the input assessment scores and the output results. Emerging as positive, all the discerned relationships confirmed that better outputs did in fact relate well to better inputs. Research limitations/implications - The PASS system is designed to be very objective, hence the criteria and assessment of inputs may be restricted to easily measurable items. The sample size obtainable was small, but still considered to be adequate for this initial study. Practical implications - Construction clients could choose to improve their contractor selection processes by identifying and incorporating contractor input factors that are seen to influence performance outputs. Contractors can also improve their outputs by focusing on the identified critical inputs. Originality/value - Few studies have sought to discern relationships between contractor inputs and their performance outputs through a quantitative approach. This case study provided a methodology, incorporating a statistics-based approach along with examples and explanations of how inputs can influence contractor outputs.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | construction industry; contractor selection; Hong Kong; performance assessment; performance criteria; performance prediction |
| Index terms: | performance criteria, methodology, contractor performance, performance prediction, construction client, sample size, case study, contractor selection, Hong Kong, performance assessment, statistics, public client, construction industry |
| Subjects: | industry analysis, sociology, assessment methods, contract management, Geography, performance management, tendering, research methods, performance measurement, practitioner, research design and methodology, mathematical modelling, data collection methods |
| Topics: | Procurement, Stakeholder Management, Roles and Professions, Geographical Context, Research Practice, Contract Administration, Human Resources, Quality Management |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here