Bonev, M; Wörösch, M and Hvam, L (2015) Utilizing platforms in industrialized construction: A case study of a precast manufacturer. Construction Innovation, 15(1), pp. 84-106. ISSN 1471-4175
Abstract
Purpose - The purpose of this paper is to explore the development of a platform-based project execution in the industrialised construction sector, with a focus on systematically balancing cost and value. Offering custom-tailored buildings at reasonable costs has been a growing concern for many construction companies. A promising approach adapted by operations management and design theory regards individual building projects as the adjustment and recombination of components and processes from a set of predefined platforms, while configuration systems assure feasible building solutions. Design/methodology/approach - After adapting some of the underlying assertions of platform design to the engineer-to-order (ETO) situation in construction, the practical implications are evaluated on a case study of a precast manufacturer using high performance concrete. Findings - Based on empirical findings from three distinct platform strategies, this research highlights key aspects of adapting platform-based developed theory to industrialised construction. Building projects use different layers of product, process and logistics platforms to form the right cost - value ratio for the target market application, while modelling methods map structural platform characteristics so as to balance commonality and distinctiveness. Originality/value - This paper proposes a general theory of platform-based development and execution in the industrialised construction sector, which goes beyond concurrent approaches of standardising and systemising buildings projects. It adapts and extends established frameworks for platform development to the ETO situation in construction and empirically validates their cost and value effects.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | value,platform,engineer-to-order,industrialized construction,mass customization,postponement |
| Index terms: | operations management, industrialized construction, methodology, configuration, engineer-to-order, postponement, strategy, construction company, manufacturer, mass customization, modelling, high-performance concrete, platform, case study |
| Subjects: | research methods, management, manufacturing engineering, digital design, project controls, systems engineering, organization, data collection methods, construction type, practitioner, materials science, analytical methods |
| Topics: | Roles and Professions, Construction Technology, Business Strategy, Research Practice, Engineering Principles, Time Control, Digital Applications |
| Descriptive scope: | 4 PCTE |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here