Shokri-Ghasabeh, M and Chileshe, N (2016) Critical factors influencing the bid/no bid decision in the Australian construction industry. Construction Innovation, 16(2), pp. 127-157. ISSN 1471-4175
Abstract
Purpose The purpose of this study is to investigate and rank the critical factors influencing the bid/no bid criteria and their importance in the Australian construction industry. Design/methodology/approach The research study has been undertaken by conducting an extensive literature review on bid/no bid decision-making criteria. As a result, the researchers identified 26 most common bid/no bid decision-making criteria that are accordingly grouped into five distinct categories, namely, “project”, “market”,“contractor”, “client” and “contract”. The literature review was followed by a national survey that was designed and utilised by the researchers to collect data for this purpose. The survey was sent to potential 450 Australian construction companies in various locations and responses were received from 81 Australian construction companies. Response data were subjected to descriptive and inferential statistics. Kruskal Wallis one-way analysis of variance (ANOVA) was applied to detect significant differences between the mean score grouped according to the organisation size (contract value). Findings The descriptive and empirical analysis demonstrated a disparity of ranking of the 26 bid/no bid criteria factors among the groups; however no statistically significant differences among the 26 bid/no criteria factors despite the absolute differences in the rankings and mean scores in the following four factors: (1) “bidding condition”, (2) “strength/weaknesses”, (3) “contract payment terms” and (4) “number of competitors/bidders”. Based on the overall sample, the highly ranked four factors were “client financial capability”, “project risk”, “project future benefits and profitability” and “number of competitors/bidders”. The following were the least ranked: “contractors' financial situation”, “project duration” and “contractors' material availability”. “Client financial capability”and “project risk” were jointly ranked as the most important by large, whereas “client financial capability” was also rated highly for smaller Australian construction contractors (ACCs). The medium ACCs had “project risk”as highly ranked. Research limitations The majority of the participants were small construction contractors in Australia. The reason is that the researchers were not aware of the contractors' size prior to inviting them for participation in the research study. Second, the findings may not generalise to other industries or to organisations operating in other countries. Practical implications The identified “bid/no bid criteria” increase the awareness of existing decision-making practices and play a critical role in the future decisions of the construction companies, where decision makers need to evaluate the next opportunities encountered. Furthermore, knowledge and possession of these identified “bid/no bid” criteria would enable contractors to select a project with a higher probability of success in the future, which will accordingly result in long-term financial benefits and higher performance. Finally, the awareness of these factors could contribute to changing the contractor’s behaviours when bidding in a competitive environment or market conditions. Originality/value The study contributes to the body of knowledge on tendering and bidding practices among contractors in Australia, an area previously under explored. Second, this study provides some insights on the factors influencing the bid/no bid decisions among the ACCs.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | Australia,construction industry,survey,bidding decision,bid/no bid criteria,construction contractors |
| Index terms: | national survey, variance, Australia, critical factor, bidder, profitability, duration, construction industry, statistics, disparity, market condition, literature review, survey, construction company, methodology, decision-making, body of knowledge, construction contractor, bidding, bid/no-bid |
| Subjects: | Geography, research methods, industry analysis, measurement and scaling, decision analysis, social justice, project controls, practitioner, economic and policy analysis, mathematical modelling, organization, data collection methods, risk assessment, economic analysis, bidding, knowledge management, data analysis and analytics, research products and data |
| Topics: | Ethics, Time Control, Business Strategy, Information Management, Geographical Context, Research Practice, Roles and Professions, Risk Management, Procurement |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here