Building information modelling (BIM) capability and delivery success on construction projects

Mahamadu, A M; Mahdjoubi, L; Booth, C; Manu, P and Manu, E (2019) Building information modelling (BIM) capability and delivery success on construction projects. Construction Innovation, 19(2), pp. 170-192. ISSN 1471-4175

Abstract

Purpose: In spite of emerging research on building information modelling (BIM) capability assessment, there is a general dearth of knowledge about the links between often pre-emptive capability measurement attributes and actual delivery success. More so, current studies have not considered success from the wider construction supply chain (CSC) perspective. So far, the perceived importance of capability metrics is not based on post-project evaluations of their contribution to BIM delivery success. This paper aims to identify relevant BIM capability attributes used for qualifying CSC organisations for projects and further aims to investigate their relative importance and influence on some key aspects of BIM delivery success. Design/methodology/approach: Based on heretofore validated set of BIM capability attributes from semi-structured interviews and a Delphi study, a survey of CSC firms on BIM-enabled projects was used to model the influence of BIM capability attributes on BIM delivery success. Multiple regression modelling was performed to ascertain the nature of the relationship between BIM capability attributes and the key aspects of BIM delivery success as identified from the literature. Findings: BIM staff experience and the suitability of proposed methodology prior to project commencement were identified as the most influential on BIM delivery quality, as well as delivery within schedule and on budget. Conversely, the administrative and strategic-level capacities were found as the most influential in leveraging collaboration, coordination or integration of the CSC on projects through BIM. Originality/value: This study provides a step change in prioritising BIM capability criteria based on evidence of their contribution to delivery success in key performance areas, rather than their perceived importance as capability metrics as widely practised.

Item Type: Article
Uncontrolled Keywords: building information modelling; construction supply chain; delivery; performance; projects; success
Index terms: collaboration, step-change, suitability, coordination, survey, construction supply chain, relative importance, project evaluation, interview, building information modelling, performance areas, methodology, construction project, Delphi method, modelling, multiple-regression, prioritizing, evidence, integration
Subjects: evaluation and assessment methods, design criteria, information systems, operations management, analytical methods, production management, research methods, data collection methods, management, value management, innovation studies, decision analysis, organizational analysis, construction logistics, risk assessment, statistical analysis
Topics: Engineering Principles, Supply Chain Management, Business Strategy, Organizational Design, Risk Management, Design Practice, Project Management, Research Practice, Digital Applications
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here