An off-site construction readiness maturity model for the Indian construction sector

Bendi, D; Rana, M Q; Arif, M; Goulding, J S and Sawhney, A (2021) An off-site construction readiness maturity model for the Indian construction sector. Construction Innovation, 21(1), pp. 123-142. ISSN 1471-4175

Abstract

Purpose: This paper aims to present an off-site construction (OSC) readiness maturity model for assessing the readiness of offsite construction companies in the Indian construction sector. Design/methodology/approach: The research was conducted in three stages. The first stage consisted of a detailed literature review to document 17 different variables affecting the OSC adoption in India. In Stage 2, 15 semi-structured interviews were carried out where the participants were asked to refine those variables for the Indian context and define what would be different levels of attainment. In the third stage, another set of 5 semi-structure interviews was performed to validate the maturity levels and definitions. Findings: A three-level OSC readiness maturity model is presented for discussion. This describes 17 variables at different levels of maturity. Practical Implications: The proposed OSC readiness maturity model guides construction practitioners in India through a structured process to enable them to assess their OSC readiness in the market. This assessment enables them to evaluate and benchmark their processes through the strategic and operational phases. The maturity model also identifies the areas of concern and the scope for further development or change to secure the optimal advantage of OSC methods. Originality/value: The research produced a model to assess the readiness of OSC adoption in the Indian construction sector. Although the model has been applied to the Indian construction sector, it can easily be modified to accommodate other OSM contexts.

Item Type: Article
Uncontrolled Keywords: housing; maturity model; modular construction; offsite construction; India; open manufacturing
Index terms: literature review, construction company, construction practitioner, interview, construction sector, open manufacturing, housing, modular construction, methodology, maturity level, maturity model, off-site construction, India
Subjects: data analysis and analytics, data collection methods, construction type, organization, industry analysis, building construction, Geography, professional development, evaluation, manufacturing engineering, research methods
Topics: Business Strategy, Engineering Principles, Information Management, Research Practice, Geographical Context, Construction Technology
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here