Abstract

Purpose: This paper aims to examine general contractors’ experiences of using off-site manufactured structural framing systems. This engaged a single-case study using a qualitative methodology to identify expected benefits, actual benefits and challenges of such systems. Design/methodology/approach: A single-case study approach evaluated general contractors’ experience of using a manufactured structural framing system. Qualitative data were collated and analyzed from industry domain experts to determine commonalities and thematic thinking. Findings: The study revealed that the reasons behind considering off-site building systems were: accelerating the project schedule, overcoming site constraints and having a better end-product. The top expected benefits were: saving time (schedule), saving cost and improving quality. The top actual observed benefits were: saving erection time, reducing waste generation, reducing project costs, reducing safety risks and improving construction site logistics. The main challenges encountered were: unfamiliarity of different project parties with the off-site framing system, difficulty with reducing the overall project schedule, heavy site logistics and complicated off-site system design and standards requirements. The findings include solutions to overcome the challenges associated with using a manufactured structural system. Research limitations/implications: This paper was a case study and therefore inherently limited in its generalizability. The study was conducted with general contractors in the mountain-west region of the USA. However, the implications of the study may have a broad application, as contractors across the globe seek to find similar solutions to using off-site or manufactured construction methods. Practical implications: Construction labor shortages around the world are forcing the construction industry to find creative solutions to meet the demand for their services. Manufactured or off-site construction methods provide a possible solution to that labor shortage. However, builders need to be aware of the immediate challenges and actual benefits of using a manufactured structural framing system. Social implications: Manufactured structural framing systems have the potential to impact lean and sustainable practices in construction. Reduced waste, reduced on-site man-power requirements, reduced construction schedules and reduced injuries each improve the lives of construction workers and the communities around these buildings. Originality/value: An extensive literature review was performed to guide the design of this case study. Much has been written about off-site construction practices, but there is a significant research gap on the topic of structural framing systems. This study contributes to expanding the knowledge of off-site construction and specifically helps researchers and practitioners understand the challenges and benefits of this systematic approach to construction.

Item Type: Article
Uncontrolled Keywords: off-site construction; structural framing systems; general contractors; case study
Index terms: waste generation, sustainable practice, case study, construction worker, off-site construction, construction industry, labour shortage, construction labour, building system, builder, project party, construction method, framing, project cost, construction site, literature review, general contractor, injury, site logistics, shortages, practitioner, methodology
Subjects: data collection methods, environmental impact, engineering systems, practitioner, work location, operations management, conceptual models, data analysis and analytics, economic analysis, management, research methods, economics, building construction, sustainable practices, health conditions and diseases, sociology, industry analysis
Topics: Engineering Principles, Research Practice, Health and Safety, Cost Management, Sustainability, Construction Technology, Roles and Professions, Stakeholder Management, Supply Chain Management, Site Management
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here