Evaluating lean techniques to improve success factors in the construction phase

Noorzai, E (2023) Evaluating lean techniques to improve success factors in the construction phase. Construction Innovation, 23(3), pp. 622-639. ISSN 1471-4175

Abstract

Purpose: This paper aims to develop a decision-making model to analyze and select the most appropriate lean technique (LT), considering success factors to improve site management and reduce waste in the construction phase. Design/methodology/approach: A comprehensive literature review identified six LTs and the 11 most critical factors affecting the efficiency of the construction phase. Then, the appropriateness of these LTs to improve the identified factors were assessed using the analytic hierarchy process. At last, a sensitivity analysis of the results was performed to validate the findings. Findings: The results show that the most effective LT to improve success factors in the construction phase is “Daily Huddle Meetings”, and the most critical factor with the greatest impact on LT selection is determined to be “Efficient Construction Management”. Originality/value: Few studies have evaluated the suitability of LTs in terms of construction success factors (CSFs). Hence, given the vital role of the construction phase in the whole project life cycle and the impact of LTs in improving the productivity of this phase, this research investigates the correlation between LTs and CSFs to promote efficient site management.

Item Type: Article
Uncontrolled Keywords: ahp; construction phase; construction success factors; decision-making; lean construction; lean techniques; site management; success; success factors
Index terms: construction phase, site management, critical factor, life cycle, productivity, efficiency, suitability, decision-making, methodology, success factor, literature review, sensitivity analysis, lean construction
Subjects: design criteria, environmental hazards, building construction, decision analysis, management, research methods, performance management, construction operations, data analysis and analytics, project delivery, health monitoring assessment and metrics, value management, risk assessment
Topics: Site Management, Design Practice, Quality Management, Risk Management, Sustainability, Health and Safety, Business Strategy, Research Practice, Project Management
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here