Olugboyega, O; Oseghale, G E and Aigbavboa, C (2023) Multiple holistic case study of project-level building information modelling (BIM) adoption in Nigeria. Construction Innovation, 23(3), pp. 567-586. ISSN 1471-4175
Abstract
Purpose: This study aims to undertake a contextual analysis of project-level building information modelling (BIM) adoption in Nigeria and demonstrate how BIM is applied across different projects in Nigeria. Design/methodology/approach: This research generates contextual and holistic understandings of multiple project-level cases of BIM adoption through an interpretive paradigm guided by relativist ontology and subjectivist epistemology. Two models of project-level BIM adoption (ten-factor theory of BIM adoption and strategic-contingent model of BIM adoption) were merged to formulate the BIM adoption assessment scale (BIM-AAS). A qualitative-oriented case study protocol was developed to extract valid and reliable data from external and internal project data based on BIM-AAS features. The extracted data were analysed using the pattern-matching technique and cross-case analysis. Findings: The results indicate that there was substantial use of BIM tools and technologies in the projects. All the projects adopted collaborative procurement and team and developed integrated building information models. The use of BIM tools, technologies and processes in the projects was found to be above average. The complexities and expectations levels of the projects compliment the nature of BIM adoption in the projects. Research limitations/implications: The BIM-AAS adopted in this research is an excellent example of a project-level BIM adoption analytical tool. It can be assumed in future research. Also, this research contributes to the theory that the level of project complexity and expectations must align with the level of BIM adoption in projects. The study’s findings ratify BIM tools, technologies and processes as the elements of project-level BIM adoption. Practical implications: This research substantiates the actual nature and structure of BIM adoption in Nigeria, thereby simplifying the development of initiatives towards BIM adoption in projects and determining the appropriate strategies for BIM implementation and innovation in the Nigerian construction industry. The most important initiative that the Nigerian government can make to drive BIM implementation is the automating of code checking for building rules and regulations in Nigeria. Originality/value: Previous studies have only reported cases of project-level BIM adoption using surveys and without a standardised project-level BIM adoption model to guide the analysis. This study is the first to formulate and use BIM adoption models for a uniform, critical and contextual analysis of project-level BIM adoption.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | Africa; BIM; BIM adoption; BIM Africa; BIM implementation; BIM Nigeria; BIM projects in Africa; BIM projects in Nigeria; strategic-contingent model of BIM adoption; ten-factor theory of BIM adoption |
| Index terms: | Nigeria, case study, Africa, building information modelling, epistemology, construction industry, implementation, ontology, survey, project data, strategy, project complexity, complexity, cross-case analysis, regulation, interpretive paradigm, methodology |
| Subjects: | management, education and knowledge transfer, research methods, organizational theory, Geography, industry analysis, information systems, political science, systems engineering, data collection methods, research design and methodology, knowledge theory, data analysis and analytics, contractual arrangements, regions and continents |
| Topics: | Digital Applications, Governance, Procurement, Engineering Principles, Project Management, Geographical Context, Research Practice, Business Strategy |
| Descriptive scope: | 4 PCTE |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here