Sagar, S K; Oladinrin, O T; Arif, M and Rana, M Q (2023) Interpretive structural model of trust factors in construction virtual project teams. Construction Innovation, 23(1), pp. 248-264. ISSN 1471-4175
Abstract
Purpose: Organisational dependence on virtual project teams (VPTs) is growing dramatically due to the substantial benefits they offer, such as efficiently achieving objectives and improving organisational performance. One of the major issues that influence the effectiveness of VPTs is trust building. This study aims to determine the key factors of trust in VPTs and design a model by identifying the interrelationships among the trust factors. Design/methodology/approach: Focus group discussion was used to gather data on factors affecting trust in VPTs and their interrelationships. Interpretive structural modelling (ISM) was used to establish the relationship among the factors. Cross-impact matrix multiplication applied to classification analysis was conducted to identify the driving power and the dependence power towards effective VPTs in the construction sector. Findings: The finding revealed that “characteristics of team members” (such as ability, integrity, benevolence, competence, reliability and professionalism) is the most significant factor for building trust in virtual team members. Some factors were further identified as having high driving power, while others were defined as having high dependence variables. Practical implications: The findings will assist construction managers and practitioners dealing with VPTs identify the factors influencing trust among team members. Taking cognisance of the factors that influence trust will enable them to design more effective virtual team arrangements. Originality/value: As the first research of its kind using ISM technique, the study offers insights into interrelationships between trust factors in the construction VPTs. It provides guides for construction managers on the effective management of trustworthy VPTs.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | focus group; interpretive structural modelling; middle east; team working; trust; virtual project teams |
| Index terms: | virtual team, competence, methodology, construction sector, construction manager, professionalism, integrity, practitioner, project team, organizational performance, effectiveness, interpretive structural modelling, focus group, Middle East, trust factor, trust-building |
| Subjects: | physical geography and landforms, performance management, psychology, industry analysis, practitioner, personnel development, information systems, professional development, research methods, health safety and environment, project delivery, data collection methods, profession, performance measurement, data analysis and analytics |
| Topics: | Organizational Design, Digital Applications, Human Resources, Quality Management, Research Practice, Project Management, Roles and Professions, Health and Safety, Information Management, Geographical Context |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here