Sociotechnical dimensions of BIM-induced changes in stakeholder management of public and private building projects

Mani, S; Ahmadi Eftekhari, N; Hosseini, M R and Bakhshi, J (2024) Sociotechnical dimensions of BIM-induced changes in stakeholder management of public and private building projects. Construction Innovation, 24(2), pp. 425-445. ISSN 1471-4175

Abstract

Purpose: This paper aims to explore the various sociotechnical dimensions of building information modelling (BIM)-induced changes associated with stakeholder management of projects. Design/methodology/approach: This paper relies on grounded theory and data collection from two case studies – one in the public sector and one in the private sector – and is underpinned by Leavitt’s (1964) sociotechnical model. Findings: Findings reveal four new dimensions of stakeholder management as being affected through BIM-induced changes: commitment; transparency; learning and experience; and stakeholder satisfaction, with these extending beyond the dimensions recognised in the existing literature. Another novelty lies in bringing to light the highly context-specific nature of BIM-induced changes pertinent to stakeholder management, with the two case studies demonstrating differences in these changes. Furthermore, a theoretical model of the causal impacts of various identified dimensions is presented, in which the sequence of changes and the causal associations between the identified dimensions are conceptualised. Originality/value: Through Leavitt’s (1964) Diamond lens, the procedure of change and its evolutionary procedure for various components of the sociotechnical system of stakeholder management are theorised. The tentative conceptualisations presented offer a springboard from which to further investigate the episode of change pertinent to various dimensions of stakeholder management in BIM-enabled projects.

Item Type: Article
Uncontrolled Keywords: change management; digitalisation; implementation; project management; transition
Index terms: public sector, private sector, grounded theory, case study, building information modelling, project management, transparency, dimension, implementation, stakeholder satisfaction, commitment, change management, digitalization, stakeholder management, methodology
Subjects: information systems, industry analysis, administrative law, research methods, management, theoretical framing, project management theory and practice, professional development, digital technology, psychology, health monitoring assessment and metrics, contractual arrangements, participation process, data collection methods
Topics: Digital Applications, Legal Issues, Organizational Design, Information Management, Research Practice, Project Management, Health and Safety, Business Strategy, Procurement, Stakeholder Management
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here