Qureshi, A H; Alaloul, W S; Wing, W K; Saad, S; Alzubi, K M and Musarat, M A (2024) Factors affecting the implementation of automated progress monitoring of rebar using vision-based technologies. Construction Innovation, 24(3), pp. 770-789. ISSN 1471-4175
Abstract
Purpose: Rebar is the prime component of reinforced concrete structures, and rebar monitoring is a time-consuming and technical job. With the emergence of the fourth industrial revolution, the construction industry practices have evolved toward digitalization. Still, hesitation remains among stakeholders toward the adoption of advanced technologies and one of the significant reasons is the unavailability of knowledge frameworks and implementation guidelines. This study aims to investigate technical factors impacting automated monitoring of rebar for the understanding, confidence gain and effective implementation by construction industry stakeholders. Design/methodology/approach: A structured study pipeline has been adopted, which includes a systematic literature collection, semistructured interviews, pilot survey, questionnaire survey and statistical analyses via merging two techniques, i.e. structural equation modeling and relative importance index. Findings: The achieved model highlights “digital images” and “scanning” as two main categories being adopted for automated rebar monitoring. Moreover, “external influence”, “data-capturing”, “image quality”, and “environment” have been identified as the main factors under “digital images”. On the other hand, “object distance”, “rebar shape”, “occlusion” and “rebar spacing” have been highlighted as the main contributing factors under “scanning”. Originality/value: The study provides a base guideline for the construction industry stakeholders to gain confidence in automated monitoring of rebar via vision-based technologies and effective implementation of the progress-monitoring processes. This study, via structured data collection, performed qualitative and quantitative analyses to investigate technical factors for effective rebar monitoring via vision-based technologies in the form of a mathematical model.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | digital monitoring; quality inspection methodologies; rebar monitoring parameters; steel reinforcement |
| Index terms: | rebar, fourth industrial revolution, reinforcement, monitoring, quality inspection, construction industry, implementation, pipeline, statistical analysis, questionnaire, reinforced concrete, methodology, progress monitoring, construction industry practice, emergence, image quality, quantitative analysis, digitalization, mathematical model, interview, survey, relative importance index, structural equation modelling |
| Subjects: | building materials, digital technology, contractual arrangements, data analysis and analytics, data science, technology adoption, mathematical modelling, risk assessment, data collection methods, control systems, project controls, statistical analysis, systems engineering, quality assurance, infrastructure and transport systems, industry analysis, research methods, management, computer vision |
| Topics: | Risk Management, Procurement, Business Strategy, Research Practice, Engineering Principles, Construction Materials, Time Control, Site Management, Digital Applications, Quality Management |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here