Barchester low rise: A case study of a management contract for remedial work to a large housing scheme

Brett-Jones, A T (1983) Barchester low rise: A case study of a management contract for remedial work to a large housing scheme. Construction Management and Economics, 1(2), pp. 91-117. ISSN 01446193

Abstract

A case study of substantial remedial work to 580 dwellings was undertaken. Certain provisions and consequences had to be taken into account. These included: uncertainty of the extent of the defects, it was essential to remedy with tenants in occupation; a pilot contract approach taking 37 dwellings of different types and situations in order to identify the extent of the defects; test buildability of design solution; monitoring of costs; refining design accordingly; monitoring costs to establish productivity on afull production run; the need for a management contract to ensure that the objectives of the pilot project were carried out; selection of a management contractor in competition; preparation of tender documents; evaluation of contractors' submissions; appointment of a management contractor; monitoring the pilot contract; measuring performance arising from revisions to design and familiarity with the work; innovative use of temporary shelters over dwellings; feasibility studies on optimum annual spend on the main contract; negotiation of main contract on a management basis; main contract documentation; post-contract cost control against target and in relation to resources used; review meetings; risk analysis.

Item Type: Article
Uncontrolled Keywords: Housing; management contracts; remedial work
Index terms: productivity, management contractor, case study, negotiation, monitoring, tenant, occupation, feasibility study, large housing, buildability, risk analysis, contract documentation, housing, cost control, tender document, competition, temporary shelter
Subjects: economic development, management, tendering, design efficiency, environmental hazards, market analysis, conflict resolution, sociology, practitioner, control systems, data collection methods, construction type, contractual arrangements, financial and cost management, design stages
Topics: Procurement, Construction Technology, Sustainability, Stakeholder Management, Roles and Professions, Research Practice, Business Strategy, Cost Management, Site Management, Design Practice, Urban Studies
Descriptive scope: 3 PCE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here