Building maintenance planning and estimating system

Lewis, B T (1983) Building maintenance planning and estimating system. Construction Management and Economics, 1(3), pp. 217-231. ISSN 01446193

Abstract

Building maintenance work measurement is no substitute for good management, yet without the use of time standards maintenance departments are unlikely to operate efficiently and effectively. Such departments may have skilled craftsmen and up-to-date tools and equipment but operating efficiency may be only 50% of capacity. The cause of this low productivity can often be traced to the lack of a common unit of work measurement for each job which is understood by supervisors and craftsmen when considering costs, performance and goals. This paper describes a set of building maintenance time standards developed and published by the United States Navy, titled Engineered Performance Standards. The time standards are used for comparative planning and estimating in either a manual or computerized mode in public or private sector organizations. The data is readily available to maintenance organizations.

Item Type: Article
Uncontrolled Keywords: engineered performance standards; estimating; maintenance; planning; productivity
Index terms: building maintenance, system building, private sector organization, productivity, craft worker, estimating, United States, supervisor, efficiency
Subjects: management, financial and cost management, organization, construction type, performance management, practitioner, building construction, Geography
Topics: Cost Management, Business Strategy, Quality Management, Engineering Principles, Construction Technology, Roles and Professions, Geographical Context
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here