Cusack, M M (1985) A simplified approach to the planning and control of cost and project duration. Construction Management and Economics, 3(3), pp. 183-198. ISSN 01446193
Abstract
This paper presents a simplified approach to the planning and control of cost and project duration. The major decisions facing management relate to problems concerning time and cost and equally important, the intrinsic relationship that exists between them. Many attempts have been made to model these factors over the past 20 years. The majority of the models produced suffered from the mathematical complexity inherent in their structure and the consequent need for high powered mainframe computing facilities to produce a solution. The most mathematically precise models were probably those developed by Meyer and Shaffer (1965), refined by Cusack (1984). The major difficulties with these models relate to the large number of constraints and variables generated. These were subsequently reduced by Cusack (1985) by concentrating the analysis on breakthrough points on the cost curve. Although substantially reducing the computing time required the models were still generating a relatively large number of variables and constraints with, again, a consequent need for high powered mainframe computers. This approach therefore still retains many of the disadvantages referred to in the Introduction. This paper describes a heuristic approach to modelling the time-cost relationship giving near optimal solutions that take advantage of the rapid technological developments in microcomputing. The implementation of the model on a microcomputer is described which, by using a phased approach makes the size of project that can be handled virtually unlimited.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | heuristic models; microcomputers; planning; time-cost |
| Index terms: | duration, complexity, computing, modelling, heuristic, implementation |
| Subjects: | contractual arrangements, analytical methods, systems engineering, project controls, risk assessment, computing systems |
| Topics: | Engineering Principles, Risk Management, Digital Applications, Procurement, Time Control |
| Descriptive scope: | 2 PC |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here