The effect of systemic factors on contract services in Nigeria

Aniekwu, A N and Okpala, C D (1988) The effect of systemic factors on contract services in Nigeria. Construction Management and Economics, 6(2), pp. 171-182. ISSN 01446193

Abstract

The productivity of the Nigerian construction industry is significantly lower than that of its foreign counterparts. Structural factors contribute to this poor performance and are dealt with in Aniekwu and Okpala (1987). This paper deals with another set of factors which are termed systemic, and which can be defined as problems arising from the application of systems not suitable to a particular environment. Through a survey, a set of these factors were identified, analysed and related to specific provisions in the conditions of contract in use. Their effects on the performance of contractors, especially local contractors, are also reviewed. It was observed that the provisions of the contractual arrangements in use are of a general nature and hence are not directed at the peculiar situations in a developing economy like Nigeria; consequently a gap exists between the basic premises on which the provisions are based and the prevalent situation in the industry. It is therefore suggested that government should institute a review of these contractual provisions with a view to formulating more workable provisions designed specifically for the local context.

Item Type: Article
Uncontrolled Keywords: contractual arrangements; delay and cost over-run; low productivity; systematic variables; wrong contractual applications
Index terms: developing economy, survey, local contractor, productivity, Nigeria, construction industry
Subjects: industry analysis, Geography, management, economic development, practitioner, data collection methods
Topics: Research Practice, Geographical Context, Business Strategy, Roles and Professions, International Construction
Descriptive scope: 4 PCTE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here