Economic optimization of construction project scheduling

Karshenas, S and Haber, D (1990) Economic optimization of construction project scheduling. Construction Management and Economics, 8(2), pp. 135-146. ISSN 01446193

Abstract

Several techniques such as CPM, PERT, and time-cost trade-off are currently used in the process of project planning. None of these techniques, nor any combination of them, guarantees a project schedule that achieves one of the most important objectives of project planning, i.e. minimizing the total project cost. In this study, binary variables are used to formulate a linear integer model for optimization of project schedules. This model minimizes the sum of the cost of all resources used by a project, including time. The resultant schedule has an optimal duration, and the resource use is levelled economically. Two examples of project schedule optimization with this method are presented. Although the proposed model in its present form cannot be easily adopted by practising engineers for large projects, it could form the basis for future automation of project scheduling and resource allocation.

Item Type: Article
Uncontrolled Keywords: construction; cost; optimization; resources; schedule
Index terms: project planning, construction project, project cost, scheduling, project scheduling, guarantee, duration, automation, time-cost trade-off, engineer, resource allocation
Subjects: production management, automation and robotics, economics, contract structure, quantity surveying, project controls, control systems, profession, resource management, operations research
Topics: Risk Management, Roles and Professions, Procurement, Cost Management, Project Management, Time Control, Site Management, Digital Applications
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here