Sawalhi, N and Enshassi, A (2005) Application of project time management tools and techniques to the construction industry in the Gaza Strip. Construction Economics and Building, 5(1), pp. 1-8. ISSN 2204-9029
Abstract
The objective of this paper is to investigate the level of applying theproject time management tools and techniques by public ownersand construction contractors in the Gaza Strip. This study hasbeen conducted by means of a survey questionnaire. Seventythreequestionnaires were distributed to target constructioncontractors and twenty-five questionnaires to public owners. Sixtycompleted questionnaires from contractors and twenty-threequestionnaires from public owners were received and analysed.The survey results indicated that contemporary project timemanagement tools and techniques are not widely used amonglocal contractors and owners. Lack of subcontractor’s knowledgeand awareness of the importance of project time managementtools and techniques are still major obstacles toward the efficientutilisation of such tools. This study recommended that there is anurgent need to establish a professional industry body such as anInstitute of Building to review and evaluate existing local projectmanagement practices. This professional body may be establishedby the government through the Ministry of Housing and PublicWorks or by the local university in cooperation with a similarinternational professional industry body. Current training effortshould be tailored to encourage owners and contractors to usework breakdown structures, resource optimisation, and networkscheduling.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | gaza strip; contractors; management tools; owners; time |
| Index terms: | time management, questionnaire, construction contractor, Gaza Strip, owner, cooperation, resource optimization, construction industry, subcontractor, housing, public owner, survey |
| Subjects: | control systems, practitioner, data collection methods, physical geography and landforms, construction type, industry analysis, psychology, project controls, sociology |
| Topics: | Roles and Professions, Stakeholder Management, Construction Technology, Geographical Context, Project Management, Research Practice, Organizational Design, Time Control |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here