Japan's building industry: The new model

Bennett, J (1993) Japan's building industry: The new model. Construction Management and Economics, 11(1), pp. 3-17. ISSN 01446193

Abstract

Japan's big five general contractors - Kajima, Obayahi, Taisei, Takenaka and Shimizu - have developed efficient production systems for their construction site work. Earlier studies show that this has been achieved by applying a very standardized approach. Yet the Japanese building industry undertakes extensive research and development, the application of which could reasonably be expected to disrupt the efficient construction-site production systems. This paper describes a study undertaken in mid-1991 that began by exploring the relationship between the research institutes and the mainstream project work of the big five. This led to a review of established theories about the way that innovation takes place which in turn directed the study towards the interaction between the big five and their environments. Two major changes in these environments are currently under way. The first is growing demands by the big five's customers for higher standards and more fashionable design. The second is a serious labour shortage in the Japanese building industry. The big five have reacted in different ways to these two major environmental changes. This discovery finally led the study into a concern with the models that managers use in understanding their work. The paper suggest that a new model, based on using the human nervous system as a metaphor, is needed in order to understand the behaviour of the big five. It is also proposed that such a model will help in designing appropriate organizations for the big five as they face and seek to influence the rapid changes now resulting from the ambitions of Japan's increasingly affluent society.

Item Type: Article
Uncontrolled Keywords: building industry; change; fashionable design; Japan; labour shortage; model building
Index terms: building industry, labour shortage, interaction, environmental change, manager, production system, society, face, construction site, general contractor, research institute, Japan, research and development
Subjects: practitioner, climate science, research organizations, psychology, work location, Geography, manufacturing engineering, economics, industry analysis, communities and social development, behavioral psychology, research management
Topics: Site Management, Organizational Design, Supply Chain Management, Stakeholder Management, Roles and Professions, Sustainability, Engineering Principles, Research Practice, Geographical Context
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here