Developing a production management modelling approach for precast concrete building products

Dawood, N N (1994) Developing a production management modelling approach for precast concrete building products. Construction Management and Economics, 12(5), pp. 393-412. ISSN 01446193

Abstract

Production management in this research is concerned with three key decisions: demand forecast, production scheduling and stock forecast. These three decisions are very much interrelated and cannot be made in isolation. Previous studies of precast concrete industry activities concluded that poduction management is fragmented. For example, production planning is done in isolation from demand forecasting and from stock forecasting. This has contributed to poor production management performance in terms of resource utilization and over-stocking. This paper goes beyond traditional production management theories and practices and develops a model to integrate all aspects of production management. The main objective is to develop an integrated production management model for the make-to-stock sector of precast concrete building products, in order to help production managers make better planning decisions and explore alternative options. The model is a factory simulator which examines and evaluates the effect of several managerial strategies on production planning and stock forecasting before actual production commences. It uses different measures of performance which facilitate the choice of planning strategies under various demands and factory conditions.

Item Type: Article
Uncontrolled Keywords: computing; precasting; production planning; scheduling; simulation; stock forecasting
Index terms: resource utilization, forecasting, precast concrete, modelling, option, manager, scheduling, production management, strategy, production planning, computing, precast concrete industry
Subjects: management, decision analysis, industry analysis, computing systems, practitioner, operations research, building materials, site logistics, prediction and forecasting, analytical methods, project delivery
Topics: Engineering Principles, Construction Materials, Research Practice, Project Management, Business Strategy, Risk Management, Roles and Professions, Digital Applications, Time Control, Site Management
Descriptive scope: 3 PCA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here