A prototype computer-based design management tool

Heath, T; Scott, D and Boyland, M (1994) A prototype computer-based design management tool. Construction Management and Economics, 12(6), pp. 543-549. ISSN 01446193

Abstract

Opportunity costs and capital mobility combine to exercise great time pressure on the design phase of major building projects. However, this phase offers the greatest possibilities for influencing the total project cost and the greatest risk of error. Anything which can be done to shorten design time while maintaining or increasing reliability thus has the potential to produce large overall savings. A key factor is increasing the effectiveness of information management. Computers now offer the possibility of improving information management. However, it will be necessary to overcome the resistance of the design culture. This paper describes the prototype of a computer-based aid which supports information management and decision processes for building design and which takes account of the attitudes of design managers.

Item Type: Article
Uncontrolled Keywords: computer-based management; cost; design; information management; risk
Index terms: project cost, prototype, design manager, design management, decision process, savings, mobility, exercise, building design, effectiveness, design phase
Subjects: infrastructure and transport systems, decision analysis, design process, economics, performance management, professional practice, economic analysis, architectural design, modelling and simulation, health behaviours and lifestyles, profession
Topics: Quality Management, Urban Studies, Design Practice, Engineering Principles, Health and Safety, Cost Management, Business Strategy, Risk Management, Roles and Professions
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here