Just-in-time application and implementation for building material management

Akintoye, A (1995) Just-in-time application and implementation for building material management. Construction Management and Economics, 13(2), pp. 105-113. ISSN 01446193

Abstract

Materials constitute a huge proportion of the cost of construction. Materials are sometimes ordered weeks or even months ahead of requirement leading to uneconomical inventory on construction sites or contractors' warehouses. Building material inventory represents cost to procure, cost to store and insure, cost to guard against theft and cost incurred when inventory becomes obsolete. This paper presents an overview of the Just-in-Time (JIT) production system and discusses application and implementation issues for the control of material inventory in building construction. JIT ensures that suppliers deliver directly to the production floor to achieve either a reduction in inventory or zero inventory and consequently a reduction in production costs. Implementation of JIT building material management in construction has the potential to realize the same far reaching benefits experienced in manufacturing. Relevant factors to consider in JIT implementation for material inventory management in construction are implications for construction output and quantities, production planning, design planning, construction contractor and suppliers' relationships, material sourcing, and education and training.

Item Type: Article
Uncontrolled Keywords: building material management; electronic data interchange; inventory; just-in-time; purchasing; suppliers
Index terms: construction output, construction contractor, just-in-time, production planning, construction site, building construction, production system, production cost, theft, education and training, implementation, building material, purchasing, inventory, electronic data interchange
Subjects: criminal law, practitioner, building materials, work location, operations management, project delivery, contractual arrangements, manufacturing engineering, inventory management, building construction, professional education, lean logistics, data management, procurement strategy
Topics: Legal Issues, Design Practice, Digital Applications, Supply Chain Management, Education, Site Management, Project Management, Engineering Principles, Roles and Professions, Construction Technology, Procurement
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here