Chan, A P C and Yeong, C M (1995) A comparison of strategies for reducing variations. Construction Management and Economics, 13(6), pp. 467-473. ISSN 01446193
Abstract
Most building contracts make provisions for the contract administrator to issue orders for variations from the original design. Often, these changes involve additional cost and disruption to work already under way, leading to cost and time ovenuns. Thus, reducing variations is one of the prerequisites of keeping the cost within budget and completing the project on time. The main objective of this paper is to investigate methods ofreducingvariations. A series of structured interviews were camed out with the practitioners in the construction industry to identify the prevailing strategies for variation reduction. The identified strategies then formed the basis of a questionnaire which was sent randomly to 100 construction firms in Australia and Malaysia, respectively. The respondents were asked to rank the relative usefulness of the identified strategies for variation reduction. Thirty-two sets of questionnnaires from Australia and 33 sets from Malaysia were returned, respectively, which represented an overall response rate of more than 32%. Concordance analysis was used to provide some evidence of any abnormal data source. When applied to the study data, a significant amount of agreement was found on the ranking strategies for the reduction of variations amongst the respondents in each country. Respondents from both countries considered clear and thorough brief as the most useful strategy for reducing variations and avoiding the use of nominated subcontractors as the least effective measure. However, when the rankings of the two countries were compared using the Spearman correlation coefficient, it was found that there was significant disagreement between the two sets of ranking. The significant difference might be attributable to the difference between the countries in terms of culture, politics, regulations, economic conditions and construction practice. These differences could also be reflected in their attitude towards contract claims.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | concordance analysis; rank correlation; strategy; variations |
| Index terms: | variation, evidence, questionnaire, practitioner, regulation, subcontractor, interview, contract administrator, strategy, construction firm, contract claim, construction industry, Malaysia, building contract, economic condition, Australia, politics |
| Subjects: | political science, industry analysis, payment, Geography, contractual condition, management, economic analysis, practitioner, organization, contract type, data collection methods, evaluation and assessment methods |
| Topics: | Roles and Professions, Governance, Procurement, Business Strategy, Geographical Context, Research Practice, Contract Administration |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here