Dawood, N N (1995) An integrated knowledge-based/simulation approach to production planning: An application to the pre-cast industry. Construction Management and Economics, 13(1), pp. 53-64. ISSN 01446193
Abstract
Production planning, in general, is the allocation of resources to jobs in a manner that should satisfy the criteria of minimizing cost and satisfying customers. It is a complicated process and demands well-defined techniques, time and experience to achieve satisfactory results. An integrated knowledge-based/simulation approach to production planning is introduced and discussed in this paper as a possible alternative to traditional operational research methods. Based on this approach a computer-based simulation model is developed to model production facilities of a pre-casting factory and integrated with knowledge-based rules that mimic the decision-making process of a human planner. The knowledge rules which were developed by eliciting knowledge from a production manager and previously published literature are of three different types: product selection rules, plant selection rules and allocation rules. In order to verify and validate the model, a thorough industrial case study has been conducted through comparing the performance of the model to that of a human planner. From the results of the study it is concluded that the model is a valuable and considerable managerial tool for exploring and testing options open to production managers.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | computing; knowledge rules; pre-casting; production planning; scheduling; simulation |
| Index terms: | production planning, scheduling, option, decision-making process, planner, testing, computing, operational research, case study, manager |
| Subjects: | professional practice, operations research, management, computing systems, profession, data collection methods, practitioner, decision analysis, project delivery |
| Topics: | Project Management, Engineering Principles, Digital Applications, Business Strategy, Risk Management, Research Practice, Roles and Professions, Time Control |
| Descriptive scope: | 4 PCTE |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here