Critical BIM qualification criteria for construction pre-qualification and selection

Mahamadu, A-M; Mahdjoubi, L and Booth, C A (2017) Critical BIM qualification criteria for construction pre-qualification and selection. Architectural Engineering and Design Management, 13(5), pp. 326-343. ISSN 1745-2007

Abstract

Despite emerging research on Building Information Modelling (BIM) capability, there remain no studies that specifically look at criteria for the pre-qualification and selection of construction supply chain (CSC) firms for BIM projects. As a consequence, there is insufficient theoretical insight and empirical justification for critical BIM qualification criteria for the CSC context. In order to bridge this knowledge gap, a study was conducted to ascertain the most critical BIM capability attributes, as well as relevance to the pre-qualification and selection of suitable CSC firms for BIM-enabled projects. The relative importance of these criteria was determined based on their perceived influence on overall BIM delivery success on recent BIM-enabled projects. A sequential exploratory mixed methodological research design was adopted involving semi-structured interviews (n = 8) and a Delphi survey (n = 25) of experts, as well as a survey of CSC firms (n = 64) on BIM-enabled projects. The findings reinforce the criticality of past BIM experience in delivery success. Furthermore, it revealed that while technological infrastructure-related capacities (such as software and hardware availability) are perceived as very important qualification criteria, their actual contribution to delivery success is not as high in comparison to criteria related to previous BIM experience. This study provides insights on prioritising BIM capability criteria based on evidence on their contribution to delivery success in practice rather than their perceived importance as capability metrics.Despite emerging research on Building Information Modelling (BIM) capability, there remain no studies that specifically look at criteria for the pre-qualification and selection of construction supply chain (CSC) firms for BIM projects. As a consequence, there is insufficient theoretical insight and empirical justification for critical BIM qualification criteria for the CSC context. In order to bridge this knowledge gap, a study was conducted to ascertain the most critical BIM capability attributes, as well as relevance to the pre-qualification and selection of suitable CSC firms for BIM-enabled projects. The relative importance of these criteria was determined based on their perceived influence on overall BIM delivery success on recent BIM-enabled projects. A sequential exploratory mixed methodological research design was adopted involving semi-structured interviews (n = 8) and a Delphi survey (n = 25) of experts, as well as a survey of CSC firms (n = 64) on BIM-enabled projects. The findings reinforce the criticality of past BIM experience in delivery success. Furthermore, it revealed that while technological infrastructure-related capacities (such as software and hardware availability) are perceived as very important qualification criteria, their actual contribution to delivery success is not as high in comparison to criteria related to previous BIM experience. This study provides insights on prioritising BIM capability criteria based on evidence on their contribution to delivery success in practice rather than their perceived importance as capability metrics.

Item Type: Article
Uncontrolled Keywords: project delivery; building information modelling; capability and procurement; construction supply chain; construction; supply chains; research design; building information modeling; criteria; success; building management systems
Index terms: qualification, interview, research design, Delphi survey, building management system, project delivery, prioritizing, pre-qualification, evidence, construction supply chain, hardware, capability and procurement, building information modelling, relative importance, survey
Subjects: construction logistics, decision analysis, computer hardware, tendering, risk assessment, educational resources, research design and methodology, procurement capability, data collection methods, information systems, project delivery, mechanical systems, evaluation and assessment methods
Topics: Supply Chain Management, Procurement, Education, Research Practice, Digital Applications, Risk Management, Engineering Principles
Descriptive scope: 4 PCEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here