Checking the project plan

Scott, S (1995) Checking the project plan. Construction Management and Economics, 13(2), pp. 127-136. ISSN 01446193

Abstract

Programmes are produced by contractors on major contracts to show how they foresee their projects progressing. These programmes will typically be checked by the supervising engineer, and it is the way in which this check is implemented that is under particular scrutiny. Programmes on two major projects were studied and a questionnaire survey then carried out, to find out how supervising engineers check these programmes in practice. Armed with this information, and an understanding of the literature on the subject, a recommended procedure for carrying out these checks is offered.

Item Type: Article
Uncontrolled Keywords: programmes; project plans; schedules; supervisor’s duties
Index terms: questionnaire, duty, survey, programme, supervisor, engineer, major project
Subjects: strategic project management, practitioner, data collection methods, contractual role, profession, project controls
Topics: Time Control, Contract Administration, Roles and Professions, Project Management, Research Practice
Descriptive scope: 4 PCEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here