An investigation into construction time performance

Walker, D H T (1995) An investigation into construction time performance. Construction Management and Economics, 13(3), pp. 263-274. ISSN 01446193

Abstract

A systematic method for measuring construction time performance has been developed. This enables comparisons between individual project performances and best practice worldwide. Four factors affect construction time performance: construction management effectiveness, the sophistication of the client and the client’s representative in terms of creating and maintaining positive project team relationships with the construction management and design team, design team effectiveness in communicating with construction management and client's representative teams, and a small number of factors describing project scope and complexity. This research has indicated that construction management team performance plays a pivotal role in determining construction time performance. It also reveals an important relationship between sound client's representative management effectiveness and good construction time performance. Detailed findings provide useful performance indicators that may be used to assist in defining benchmark measures necessary to assess a project's performance relative to a representative population.

Item Type: Article
Uncontrolled Keywords: benchmarking; productivity; team management; time
Index terms: performance indicator, management effectiveness, design team, team management, population, complexity, benchmarking, productivity, best practice, project scope, effectiveness, project performance, investigation, team performance, construction time, project team
Subjects: data collection methods, business, practitioner, scope management, professional practice, project delivery, management, performance measurement, performance management, project management theory and practice, demography, project controls, systems engineering
Topics: Engineering Principles, Research Practice, Project Management, Business Strategy, Roles and Professions, Quality Management, Urban Studies, Design Practice, Time Control, Organizational Design
Descriptive scope: 3 PCA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here