Nibbelink, J-G; Sutrisna, M and Zaman, A U (2017) Unlocking the potential of early contractor involvement in reducing design risks in commercial building refurbishment projects: a Western Australian perspective. Architectural Engineering and Design Management, 13(6), pp. 439-456. ISSN 1745-2007
Abstract
The commercial refurbishment sector is widely gaining popularity, particularly in industries such as the Western Australian construction industry in order to effectively house commercial businesses and operations. Unfortunately, commercial refurbishments have long been characterised by its added complexity, risk and uncertainty facing the management and delivery of such projects. The uncertainties are largely attributed to the segregated relationship between design and construction processes. Among a multitude of options in procuring refurbishment projects, the early contractor involvement (ECI) emerged as a procurement route that bridges this typical gap between design and construction, promotes a collaborative design process and offers opportunity for risk mitigation and certainty of delivery. Whilst appearing as a worthy candidate to procure refurbishment of commercial buildings, anecdotal evidence have indicted the potential of ECI to reduce design risks through synergising the contractor's construction expertise into the design process. In light of this, the paper aims to report the findings from a recent research project conducted in Western Australia on this topic through case study approach. The findings revealed the specific points and activities during design of commercial building refurbishment where the contributions of the contractor are optimum in reducing design risks. This is captured in the resultant process map specifically developed for this type of projects under the ECI scheme. The process map is expected to further support project teams at the early design stage of a commercial building refurbishment projects to devise a robust strategy to fully benefit from procuring their project through ECI.The commercial refurbishment sector is widely gaining popularity, particularly in industries such as the Western Australian construction industry in order to effectively house commercial businesses and operations. Unfortunately, commercial refurbishments have long been characterised by its added complexity, risk and uncertainty facing the management and delivery of such projects. The uncertainties are largely attributed to the segregated relationship between design and construction processes. Among a multitude of options in procuring refurbishment projects, the early contractor involvement (ECI) emerged as a procurement route that bridges this typical gap between design and construction, promotes a collaborative design process and offers opportunity for risk mitigation and certainty of delivery. Whilst appearing as a worthy candidate to procure refurbishment of commercial buildings, anecdotal evidence have indicted the potential of ECI to reduce design risks through synergising the contractor's construction expertise into the design process. In light of this, the paper aims to report the findings from a recent research project conducted in Western Australia on this topic through case study approach. The findings revealed the specific points and activities during design of commercial building refurbishment where the contributions of the contractor are optimum in reducing design risks. This is captured in the resultant process map specifically developed for this type of projects under the ECI scheme. The process map is expected to further support project teams at the early design stage of a commercial building refurbishment projects to devise a robust strategy to fully benefit from procuring their project through ECI.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | design risks; early contractor involvement; commercial building; refurbishment projects; construction; buildings; renovation & restoration; risk reduction; refurbishment; construction industry; case studies; mitigation; design; architectural engineering; procurement contracts; bridge construction; commercial buildings; risk management; delivery contracts |
| Index terms: | Australia, procurement contract, early contractor involvement, strategy, case study, design process, risk reduction, complexity, option, early design stage, project team, refurbishment project, risk mitigation, bridge construction, construction industry, collaborative design, restoration, mitigation, design and construction, evidence, risk management, design risk, commercial building, delivery contract, renovation, architectural engineering |
| Subjects: | project delivery, contractual arrangements, design methods, data collection methods, evaluation and assessment methods, risk assessment, construction type, systems engineering, industry analysis, decision analysis, financial risk, infrastructure engineering, design process, Geography, renovation and retrofit, management, design practice |
| Topics: | Design Practice, Risk Management, Procurement, Construction Technology, Business Strategy, Cost Management, Engineering Principles, Research Practice, Project Management, Geographical Context |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here