Criteria for contractor selection

Hatush, Z and Skitmore, M (1997) Criteria for contractor selection. Construction Management and Economics, 15(1), pp. 19-38. ISSN 01446193

Abstract

This paper is concerned with identifying universal criteria for prequalification and bid evaluation, and the means by which different emphases can be accommodated to suit the requirements of clients and projects. The information, assessment and evaluation strategies currently used by procurers for screening contractors are considered, and the results are reported of an extensive literature review and a Delphic interview study with a small select sample of construction profes-sionals with extensive experience in prequalification and bid evaluation processes. The findings indicate that the most common criteria considered by procurers during the prequalification and bid process are those pertaining to financial soundness, technical ability, management capability, and the health and safety performance of contractors.

Item Type: Article
Uncontrolled Keywords: bid evaluation; criteria assessment; information; prequalification
Index terms: health and safety, strategy, bid evaluation, literature review, screening, contractor selection, interview
Subjects: health safety and environment, data collection methods, management, data analysis and analytics, tendering
Topics: Business Strategy, Research Practice, Human Resources, Procurement, Health and Safety
Descriptive scope: 4 PCEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here